
Electrification
Corus offers proven expertise and considerable experience – both in the UK and overseas – in the design and construction of Overhead Line Electrification (OLE).

High Speed 1
The High Speed 1 project, formerly called the Channel Tunnel Rail Link, is being delivered by London & Continental Railways and covers the construction and electrification of a new high speed rail route from Folkestone to St Pancras International, London.
525 KB
Download

Larkhall to Milngavie Re-opening
Corus was commissioned by Siemens to work closely with their design team inGermany to specify and develop their new basic design range of OLE equipment.
883 KB
Download

Northampton Traincare Depot
Corus made a major contribution to the Northampton Traincare Depot, a brand new depot facility located on the former down sidings north of Northampton station on the West Coast Mainline to Rugby.
153 KB
Download

OLE Mk3D Structure Assessments
Corus was commissioned by Network Rail LNE MP&I to undertake structure andcondition surveys and a risk based matrix for assessment of overhead line equipment structures and foundations, together with supporting calculations.
89 KB
Download

